Water Treatment Plant Project OwnerPT. Indoagri Tbk.LocationKabupaten Musi Banyuasin, PalembangType of TreatmentWater Treatment Plant (WTP) Raw Water SuppliesPeat water from the riverTechnologyMagnetic Ballast ClarifierCapacity30 m3/hr Ultrafiltration (UF) instruments for final processingSettling Tank with a capacity of 30 M3/hourMagnetic Ballast Clarification (MBC)